Hi All,
Going to ply line my T2 Bay bus. Don t know wether to do the sides first and butt up the floor to them, or do the floor first and sit the sides on top ( of the flooring )
Also regarding the floor to start by filling in the lowest part of the floor ,the largest area with 9mm ply, then, on...