Decided to remove the load bay floor, need to replace the crossmembers, and started to drill out the spot welds. done 100 and less than 1/2 way through. This is with a foot+ slice taken off each side as it had been "repaired" with flat sheet. Would rather replace with new but at 700 a pair...