how many?

Early Bay Forum

Help Support Early Bay Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

67panel

Well-known member
Joined
Jul 30, 2009
Messages
2,639
Reaction score
98
Location
malven
Decided to remove the load bay floor, need to replace the crossmembers, and started to drill out the spot welds. done 100 and less than 1/2 way through. This is with a foot+ slice taken off each side as it had been "repaired" with flat sheet. Would rather replace with new but at 700 a pair that's out of my budget. Got next week of so should get it stripped out.
 

Latest posts

Top