single boy
Well-known member
- Joined
- Oct 15, 2010
- Messages
- 60
- Reaction score
- 0
Hi All,
Going to ply line my T2 Bay bus. Don t know wether to do the sides first and butt up the floor to them, or do the floor first and sit the sides on top ( of the flooring )
Also regarding the floor to start by filling in the lowest part of the floor ,the largest area with 9mm ply, then, on the part by the side opposite the sliding door where it is already 5/6mm higher, fill the bit with3.5mm ply. What have others done please.?
Going to ply line my T2 Bay bus. Don t know wether to do the sides first and butt up the floor to them, or do the floor first and sit the sides on top ( of the flooring )
Also regarding the floor to start by filling in the lowest part of the floor ,the largest area with 9mm ply, then, on the part by the side opposite the sliding door where it is already 5/6mm higher, fill the bit with3.5mm ply. What have others done please.?