lucky for you andy they havent done as much work as i had hoped, so some pics
old seatbelt mount cut out, cleaned out then puddle and seam welded on the underside of the tub:
the rear of the wheel arch has been slightly scalloped to accomodate the strengthening pressings on the seat bulkheads:
fully seam welded in, both in the cab area and in the wheel arch.
trimmed tub back to fit the scallop of the inner part:
40x40 3mm box blanked off to level the new height of the seat mount. (not to potential buyers of slamwerks wheels tubs, these ARE NOT included):
they were just welding the other one in place so hopefully will be sorted by the time I go up on friday. the garage didnt look to be that busy when i went up there this lunchtime so hoping that they will make some progress this week.
the had also sorted the pinholes in the floor too. only a little left to do to the lower half before primer.
NaFe