thanks gninnam
yer with a maximum buget of £20 for most jobs i dnt think we are doing too bad
i gave it a real good clean = free
we checked all inside the boot aswell = £15 (but dnt have any pics yet)
we sprayed the wheels red and terned the tyers round to show the white walls = £36
and fitted a tuch screen cd player wich i had in the shed = free
The girlfreind made some curtains wich me and her fitted = free to fit + free as a gift
fitted a big foot throtal peddle = free to fit + free as a gift from her
i dug out a masive roof rack (wich ways a tone) from someones garden = free
then me and glenn sanded it down and painted it as soon as i weld up some brakets and have
some more people to lift it that will go on top
and i also made a "11 ball" gear nob out of a snooker ball that i defenatly did not take from work :msn4: = free (mite make it so it reads "71")
i put a new valve in the washer bottle = free because i pinched it off glenn
thats pritty much everything so far other than puting a sliding door panel on and sticker bombing it and the work we have done to the engine wich had 68 psi 5 psi 0 psi and 0 psi when we got it! :shock:
we manage to get it runing better by setting the valves putting on new plugs / ht leads and then tuned it up abit
so far so good and the aim is to get it pritty much ready for the vanjambore on may 20th at Lincoln show ground